DC AtlasOpen the interactive map →
DC Atlas / United States

Core Scientific Denton

Core Scientific · CoreWeave
Operating · AI campus · AI-focused
Grid power325 MW
IT load260 MW
Live IT today (est.)262 MW
Blackwell-equiv.156k

Reported figure: 260 MW as IT / critical load. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 Denton, TX, United States
RegionNorth America
Notes~260 MW critical IT for CoreWeave; Epoch est. 262 MW IT live, likely OpenAI workloads
Last checked2026-11-21
See it on the map →

Sources

Epoch AI — CoreWeave Denton TXhttps://epoch.ai/data/ai-data-centers/directory/coreweave-denton-txFourWeekMBA — CoreWeave Texas siteshttps://fourweekmba.com/ai-two-texas-sites-hold-786-mw-of-coreweaves-4-2-gw-contracted/

Nearby in United States

FacilityLocationGrid power
Meta Fort WorthFort Worth, TX—
Aligned PlanoPlano, TX—
CoreWeave PlanoPlano, TX—
Digital Realty RichardsonRichardson, TX—
Google MidlothianMidlothian, TX124 MW
Stargate Shackelford County (Vantage Frontier)Shackelford County, TX1.40 GW