Stargate Shackelford County (Vantage Frontier)
OpenAI · Oracle · Vantage
Under construction · AI campus · AI-focused
Grid power1.40 GW
IT load1.12 GW
Blackwell-equiv.672k
Reported figure: 1,400 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Shackelford County, TX, United States |
|---|---|
| Region | North America |
| Notes | Vantage Frontier campus, 1,200 acres; first building H2 2026 |
| Last checked | 2026-11-21 |
Sources
Epoch AI — OpenAI Stargate: where the US sites stand (Apr 2026)https://epoch.ai/publications/openai-stargate-where-the-us-sites-standData Center Frontier — Scaling Stargatehttps://www.datacenterfrontier.com/machine-learning/article/55319132/scaling-stargate-openais-five-new-us-data-centers-push-toward-10-gw-ai-infrastructure
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Stargate Abilene (Crusoe / Oracle) | Abilene, TX | 1.20 GW |
| IREN Sweetwater | Sweetwater, TX | 2.00 GW |
| Cipher Barber Lake | Colorado City, TX | 375 MW |
| Galaxy Helios | Dickens County, TX | 800 MW |
| IREN Childress | Childress, TX | 750 MW |
| Meta Fort Worth | Fort Worth, TX | — |