CoreWeave Lancaster
CoreWeave
Under construction · AI campus · AI-focused
Grid power125 MW
IT load100 MW
Blackwell-equiv.60k
Reported figure: 100 MW as IT / critical load. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Lancaster, PA, United States |
|---|---|
| Region | North America |
| Notes | $6B; 100 MW initial, up to 300 MW; Epoch est. ~92 MW IT under construction |
| Last checked | 2026-11-21 |
Sources
Epoch AI — CoreWeave Lancasterhttps://epoch.ai/data/ai-data-centers/directory/coreweave-lancaster-greenfield-siteRCR Wireless — CoreWeave $6B Lancasterhttps://www.rcrwireless.com/20250716/ai-infrastructure/coreweave-ai-data
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| AWS Susquehanna (Cumulus) | Salem Township, PA | 960 MW |
| Nebius Vineland | Vineland, NJ | 375 MW |
| Digital Realty Digital Dulles | Sterling, VA | — |
| Equinix Ashburn DC campus | Ashburn, VA | — |
| Oracle Ashburn region | Ashburn, VA | — |
| Vantage Ashburn campus | Ashburn, VA | — |