Digital Reef East Havering

Digital Reef
Planned ยท Colocation
Grid power600 MW
IT load429 MW
Blackwell-equiv.257k

Reported figure: 600 MW as grid / total power. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location๐Ÿ‡ฌ๐Ÿ‡ง Havering, London, United Kingdom
RegionEurope
Last checked2026-11-21