Nscale Loughton
Nscale · Microsoft
Under construction · AI campus · AI-focused
Grid power112 MW
IT load90 MW
Blackwell-equiv.54k
Reported figure: 90 MW as IT / critical load. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇬🇧 Loughton, Essex, United Kingdom |
|---|---|
| Region | Europe |
| Notes | 50 MW scaling to 90 MW; ~23k GB300 |
| Last checked | 2026-11-21 |