DC Atlas / United States

Microsoft Fairwater Atlanta

Microsoft
Operating · Hyperscaler · AI-focused
Grid power763 MW
IT load636 MW
Live IT today (est.)636 MW
Blackwell-equiv.382k

Reported figure: 636 MW as IT / critical load. Converted with PUE 1.20 (hyperscale data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 Fayetteville, GA, United States
RegionNorth America
NotesBuilt by QTS; Epoch est. 636 MW IT, GB200; Fairwater site #2 (Oct 2025)
Last checked2026-11-21
See it on the map →

Sources

Epoch AI — Microsoft Fairwater Atlantahttps://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-atlantaMicrosoft — Azure AI superfactoryhttps://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/

Nearby in United States

FacilityLocationGrid power
QTS Atlanta FayettevilleFayetteville, GA—
Applied Digital Delta Forge 2Brookwood, AL262 MW
Meta Forest CityForest City, NC—
Google LenoirLenoir, NC—
TeraWulf Kentucky campus (Anthropic lease)Kentucky—
AWS Madison CountyCanton, MS1.20 GW