DC AtlasOpen the interactive map →
DC Atlas / United States

AWS Madison County

Amazon (AWS)
Operating · Hyperscaler · AI-focused
Grid power1.20 GW
IT load1.00 GW
Blackwell-equiv.600k

Reported figure: 1,000 MW as IT / critical load. Converted with PUE 1.20 (hyperscale data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 Canton, MS, United States
RegionNorth America
NotesProject Rainier site; >350 MW IT today, ramping past 1 GW
Last checked2026-11-21
See it on the map →

Sources

Measured AI — AWS New Carlisle campushttps://measuredai.substack.com/p/aws-new-carlisle-data-center-campus

Nearby in United States

FacilityLocationGrid power
Meta HyperionRichland Parish, LA2.00 GW
xAI Memphis Southaven power campusSouthaven, MS—
Colossus 2Memphis, TN / Southaven, MS1.18 GW
Colossus 1Memphis, TN300 MW
Applied Digital Delta Forge 2Brookwood, AL262 MW
Applied Digital Delta Forge 1Boyce, LA430 MW