SK–AWS Ulsan AI DC
SK Group · AWS
Under construction · AI campus · AI-focused
Grid power1.00 GW
IT load800 MW
Blackwell-equiv.480k
Reported figure: 1,000 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇰🇷 Ulsan, South Korea |
|---|---|
| Region | Asia Pacific |
| Notes | 103 MW first phase (~60k GPUs) from 2027; target raised to 1 GW (Nov 2025) |
| Last checked | 2026-11-21 |
Sources
DCD — SK Telecom tenfold Ulsan expansionhttps://www.datacenterdynamics.com/en/news/sk-telecom-plans-tenfold-expansion-for-data-center-in-ulsan-south-korea-plans-to-build-facility-in-vietnam/Korea Times — Groundbreakinghttps://www.koreatimes.co.kr/business/tech-science/20250829/sk-aws-break-ground-for-ai-data-center-in-ulsan
Nearby in South Korea
| Facility | Location | Grid power |
|---|---|---|
| Naver Gak Sejong | Sejong | 324 MW |
| NHN National AI DC | Gwangju | — |
| Samsung SDS Dongtan | Hwaseong | — |
| Naver Gak Chuncheon | Chuncheon | — |
| Solaseado AI DC (Jeonnam) | Haenam, Jeonnam | — |
| LG U+ Pyeongchon | Anyang | — |