Switch Citadel Campus
Switch
Operating Β· Colocation
Grid power650 MW
IT load464 MW
Blackwell-equiv.279k
Reported figure: 650 MW as grid / total power. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | πΊπΈ Tahoe Reno, NV, United States |
|---|---|
| Region | North America |
| Notes | 7.2M sq ft; build-out up to 850 MW |
| Last checked | 2026-11-21 |