Yondr
Under construction ยท Colocation
Grid power420 MW
IT load300 MW
Blackwell-equiv.180k

Reported figure: 300 MW as IT / critical load. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location๐Ÿ‡ฒ๐Ÿ‡พ Johor, Malaysia
RegionAsia Pacific
Last checked2026-11-21
See it on the map โ†’