Yondr Johor
Yondr
Under construction ยท Colocation
Grid power420 MW
IT load300 MW
Blackwell-equiv.180k
Reported figure: 300 MW as IT / critical load. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | ๐ฒ๐พ Johor, Malaysia |
|---|---|
| Region | Asia Pacific |
| Last checked | 2026-11-21 |
Sources
Compiled from public reporting; not yet individually verified.
Nearby in Malaysia
| Facility | Location | Grid power |
|---|---|---|
| AirTrunk JHB1 | Johor | 210 MW |
| Equinix JH1 | Johor | โ |
| Princeton Digital JH1 | Johor | โ |
| Bridge DC Johor | Johor | โ |
| DayOne Nusajaya | Iskandar Puteri, Johor | 662 MW |
| YTL Green Data Center Park | Kulai, Johor | 1.20 GW |