DC AtlasOpen the interactive map →
DC Atlas / United States

Cipher Barber Lake

Cipher Mining · AWS
Under construction · AI campus · AI-focused
Grid power375 MW
IT load300 MW
Blackwell-equiv.180k

Reported figure: 300 MW as IT / critical load. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 Colorado City, TX, United States
RegionNorth America
Notes300 MW lease to AWS
Last checked2026-11-21
See it on the map →

Sources

Compiled from public reporting; not yet individually verified.

Nearby in United States

FacilityLocationGrid power
IREN SweetwaterSweetwater, TX2.00 GW
Stargate Abilene (Crusoe / Oracle)Abilene, TX1.20 GW
Galaxy HeliosDickens County, TX800 MW
Stargate Shackelford County (Vantage Frontier)Shackelford County, TX1.40 GW
TeraWulf Abernathy JVAbernathy, TX210 MW
IREN ChildressChildress, TX750 MW