DC Atlas / United States

Galaxy Helios

Galaxy Digital · CoreWeave
Operating · AI campus · AI-focused
Grid power800 MW
IT load640 MW
Live IT today (est.)133 MW
Blackwell-equiv.384k

Reported figure: 800 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 Dickens County, TX, United States
RegionNorth America
Notes800 MW gross = 526 MW critical IT for CoreWeave; phase I (133 MW IT) delivered; 1.63 GW site
Last checked2026-11-21
See it on the map →

Sources

The Block — Galaxy delivers 133 MW to CoreWeavehttps://www.theblock.co/post/407396/galaxy-delivers-133-mw-of-critical-it-load-to-coreweave-as-helios-bitcoin-mine-turns-ai-hubData Center Knowledge — Galaxy's 1.63 GW Helioshttps://www.datacenterknowledge.com/data-center-construction/galaxy-bets-its-data-center-edge-on-power-not-bragawatts-

Nearby in United States

FacilityLocationGrid power
TeraWulf Abernathy JVAbernathy, TX210 MW
IREN ChildressChildress, TX750 MW
IREN SweetwaterSweetwater, TX2.00 GW
Cipher Barber LakeColorado City, TX375 MW
Stargate Abilene (Crusoe / Oracle)Abilene, TX1.20 GW
Stargate Shackelford County (Vantage Frontier)Shackelford County, TX1.40 GW