Meta
Under construction · Hyperscaler · AI-focused
Grid power2.00 GW
IT load1.67 GW
Blackwell-equiv.1.00M

Reported figure: 2,000 MW as grid / total power. Converted with PUE 1.20 (hyperscale data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 Richland Parish, LA, United States
RegionNorth America
Notes2 GW by 2030, scaling to 5 GW; on-site gas plants
Last checked2026-11-21
See it on the map →

Sources

Epoch AI — Meta Hyperion (Sep 2026)https://epoch.ai/data/ai-data-centers/directory/meta-hyperionTechCrunch — Meta is building a 5 GW AI data centerhttps://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center

Nearby in United States

FacilityLocationGrid power
Applied Digital Delta Forge 1Boyce, LA430 MW
AWS Madison CountyCanton, MS1.20 GW
xAI Memphis Southaven power campusSouthaven, MS—
Colossus 1Memphis, TN300 MW
Colossus 2Memphis, TN / Southaven, MS1.18 GW
Applied Digital Delta Forge 2Brookwood, AL262 MW