Meta Hyperion
Meta
Under construction · Hyperscaler · AI-focused
Grid power2.00 GW
IT load1.67 GW
Blackwell-equiv.1.00M
Reported figure: 2,000 MW as grid / total power. Converted with PUE 1.20 (hyperscale data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Richland Parish, LA, United States |
|---|---|
| Region | North America |
| Notes | 2 GW by 2030, scaling to 5 GW; on-site gas plants |
| Last checked | 2026-11-21 |
Sources
Epoch AI — Meta Hyperion (Sep 2026)https://epoch.ai/data/ai-data-centers/directory/meta-hyperionTechCrunch — Meta is building a 5 GW AI data centerhttps://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Applied Digital Delta Forge 1 | Boyce, LA | 430 MW |
| AWS Madison County | Canton, MS | 1.20 GW |
| xAI Memphis Southaven power campus | Southaven, MS | — |
| Colossus 1 | Memphis, TN | 300 MW |
| Colossus 2 | Memphis, TN / Southaven, MS | 1.18 GW |
| Applied Digital Delta Forge 2 | Brookwood, AL | 262 MW |