Colossus 2
SpaceXAI (xAI)
Operating · AI campus · AI-focused
Grid power1.18 GW
IT load946 MW
Live IT today (est.)946 MW
Blackwell-equiv.568k
Reported figure: 946 MW as IT / critical load. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Memphis, TN / Southaven, MS, United States |
|---|---|
| Region | North America |
| Notes | ~946 MW IT per S-1-based estimate; expansion toward ~2 GW |
| Last checked | 2026-11-21 |
Sources
Epoch AI — Largest AI data centers by power (Nov 2026)https://epoch.ai/graphs/largest-ai-data-centers-by-power-capacityEpoch AI — Colossus 2https://epoch.ai/data/ai-data-centers/directory/colossus-2
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| xAI Memphis Southaven power campus | Southaven, MS | — |
| Colossus 1 | Memphis, TN | 300 MW |
| AWS Madison County | Canton, MS | 1.20 GW |
| Meta Hyperion | Richland Parish, LA | 2.00 GW |
| Applied Digital Delta Forge 2 | Brookwood, AL | 262 MW |
| Applied Digital Delta Forge 1 | Boyce, LA | 430 MW |