Cologix Johnstown campus
Cologix
Under construction Β· Colocation
Grid power800 MW
IT load571 MW
Blackwell-equiv.343k
Reported figure: 800 MW as grid / total power. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | πΊπΈ Johnstown, OH, United States |
|---|---|
| Region | North America |
| Notes | Eight data centers, ~$7B |
| Last checked | 2026-11-21 |
Sources
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Meta Prometheus | New Albany, OH | 1.00 GW |
| Google New Albany | New Albany, OH | 544 MW |
| AWS Ohio (New Albany / Hilliard) | Central Ohio | β |
| Stargate Lordstown | Lordstown, OH | β |
| Stargate Saline Township | Saline Township, MI | 1.40 GW |
| TeraWulf Kentucky campus (Anthropic lease) | Kentucky | β |