Google New Albany
Google
Operating · Hyperscaler · AI-focused
Grid power544 MW
IT load453 MW
Live IT today (est.)453 MW
Blackwell-equiv.272k
Reported figure: 453 MW as IT / critical load. Converted with PUE 1.20 (hyperscale data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 New Albany, OH, United States |
|---|---|
| Region | North America |
| Notes | Central Ohio TPU cluster; Epoch est. ~453 MW IT |
| Last checked | 2026-11-21 |