Stargate Saline Township
OpenAI · Oracle · Related Digital
Under construction · AI campus · AI-focused
Grid power1.40 GW
IT load1.12 GW
Blackwell-equiv.672k
Reported figure: 1,400 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Saline Township, MI, United States |
|---|---|
| Region | North America |
| Notes | Grid-powered; projected Q4 2028 |
| Last checked | 2026-11-21 |
Sources
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| AWS Ohio (New Albany / Hilliard) | Central Ohio | — |
| Cologix Johnstown campus | Johnstown, OH | 800 MW |
| Google New Albany | New Albany, OH | 544 MW |
| Meta Prometheus | New Albany, OH | 1.00 GW |
| AWS Project Rainier New Carlisle | New Carlisle, IN | 2.20 GW |
| Stargate Lordstown | Lordstown, OH | — |