Meta Prometheus
Meta
Operating · Hyperscaler · AI-focused
Grid power1.00 GW
IT load833 MW
Live IT today (est.)471 MW
Blackwell-equiv.500k
Reported figure: 1,000 MW as grid / total power. Converted with PUE 1.20 (hyperscale data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 New Albany, OH, United States |
|---|---|
| Region | North America |
| Notes | 1 GW 'titan' cluster; Epoch est. 471 MW IT live, ~1,022 MW IT projected |
| Last checked | 2026-11-21 |
Sources
Epoch AI — Meta Prometheushttps://epoch.ai/data/ai-data-centers/directory/meta-prometheusGamesBeat — How Meta built a 1 GW data centerhttps://gamesbeat.com/how-meta-built-a-1gw-data-center-in-ohio-and-is-planning-for-a-5gw-data-center-in-louisiana/
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Google New Albany | New Albany, OH | 544 MW |
| Cologix Johnstown campus | Johnstown, OH | 800 MW |
| AWS Ohio (New Albany / Hilliard) | Central Ohio | — |
| Stargate Lordstown | Lordstown, OH | — |
| Stargate Saline Township | Saline Township, MI | 1.40 GW |
| TeraWulf Kentucky campus (Anthropic lease) | Kentucky | — |