Meta El Paso
Meta
Under construction · Hyperscaler · AI-focused
Grid power1.00 GW
IT load833 MW
Blackwell-equiv.500k
Reported figure: 1,000 MW as grid / total power. Converted with PUE 1.20 (hyperscale data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 El Paso, TX, United States |
|---|---|
| Region | North America |
| Notes | 1 GW AI campus |
| Last checked | 2026-11-21 |
Sources
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Stargate Doña Ana County | Doña Ana County, NM | 2.20 GW |
| Poolside Project Horizon | West Texas | 2.00 GW |
| Meta Los Lunas | Los Lunas, NM | — |
| TeraWulf Abernathy JV | Abernathy, TX | 210 MW |
| Cipher Barber Lake | Colorado City, TX | 375 MW |
| Galaxy Helios | Dickens County, TX | 800 MW |