Poolside Project Horizon
Poolside · CoreWeave
Planned · AI campus · AI-focused
Grid power2.00 GW
IT load1.60 GW
Blackwell-equiv.960k
Reported figure: 2,000 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 West Texas, United States |
|---|---|
| Region | North America |
| Notes | 2 GW behind-the-meter gas campus |
| Last checked | 2026-11-21 |
Sources
Compiled from public reporting; not yet individually verified.
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Cipher Barber Lake | Colorado City, TX | 375 MW |
| Meta El Paso | El Paso, TX | 1.00 GW |
| TeraWulf Abernathy JV | Abernathy, TX | 210 MW |
| Stargate Doña Ana County | Doña Ana County, NM | 2.20 GW |
| IREN Sweetwater | Sweetwater, TX | 2.00 GW |
| Galaxy Helios | Dickens County, TX | 800 MW |