TeraWulf Lake Mariner
TeraWulf · Fluidstack
Operating · AI campus · AI-focused
No full build-out capacity has been published for this site, so it is excluded from DC Atlas totals. Live IT today (est.): 102 MW.
| Location | 🇺🇸 Barker, NY, United States |
|---|---|
| Region | North America |
| Notes | 102 MW delivered: 60 MW Core42/G42, 42 MW Fluidstack/Anthropic (Google-backstopped) |
| Last checked | 2026-11-21 |
Sources
Blockspace — Lake Mariner 102 MW deliveredhttps://blockspace.media/short/terawulf-coo-83-of-revenue-now-comes-from-ai-as-lake-mariner-nears-completion/Data Center Richness — Inside Lake Marinerhttps://datacenterrichness.substack.com/p/inside-an-accelerated-ai-data-center
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Homer City Energy Campus | Homer City, PA | 4.40 GW |
| Stargate Lordstown | Lordstown, OH | — |
| AWS Susquehanna (Cumulus) | Salem Township, PA | 960 MW |
| CoreWeave Lancaster | Lancaster, PA | 125 MW |
| Vantage Ashburn campus | Ashburn, VA | — |
| Equinix Ashburn DC campus | Ashburn, VA | — |